9-13-final.jpg
Note: All pics are with camera phone, because then you will be more impressed when we use a good camera

Time Remaining: 7 days

We've moved in 10%. Peter and Tino left at 5pm and SKGR and her friend Jasie (with small dog) came in at 4pm to start getting up the fine dust, unpack rocker and insert the new air purifier (our third).

The relief I felt was palpable after another long day of running around, solving problems, purchasing last minute items, vacuuming and painting some of the walls in the main room.

Tonight the windows are wide open and the purifiers are running (crazy, I know) so that we can really move in tomorrow. We are are our mother's again (sofa bed!). However (commenters beware) if it is still fume-y we will continue to stay with friends, even as we unpack and clean out the crevices. But we couldn't be happier. The baby is still in utero, we've got another night of red wine and the easy life.

9-13-aptday.jpg
Taping the walls for the China White top and the Bone White bottom...

9-13-aptday (1).jpg
For the subtle two tone in the main room. (Peter said I was crazy. It makes the room smaller he said and you barely notice it). Perhaps I am crazy, but it is hard to explain my style and how I feel it gives depth to the room.

9-13-aptday (2).jpg
Bill Skinner of Astech Closets is a dynamo. These pics took place in under one hour.....

9-13-aptday (3).jpg

9-13-aptday (4).jpg

9-13-aptday (5).jpg

9-13-aptday (6).jpg

9-13-aptday (7).jpg

9-13-aptday (8).jpg

9-13-aptday (9).jpg
Peter finishes up the second coat of the door and baseboard in Dove White....

9-13-aptday (10).jpg
We took a trip to George Taylor specialties to find this baby in stock....

9-13-aptday (11).jpg
8 inches of pure water pleasure....

9-13-aptday (12).jpg
They are SO nice there!

9-13-aptday (13).jpg
I say, what a totally cool hotel bathroom...

9-13-aptday (14).jpg
Peter starts to clean up and peel back the paper....

9-13-aptday (15).jpg
Tino measures the rod for the shower curtain in the bathroom....

9-13-aptday (16).jpg
What a beautiful floor....

9-13-aptday (17).jpg
Tino lays muriatic acid on the bathroom floor to clean it up.....

9-13-aptday (18).jpg
Green stuff starts to oooze up.......

9-13-aptday (19).jpg
Peter installs the final electrical outlets....

9-13-aptday (20).jpg
The fridge is unpacked......

9-13-aptday (21).jpg
Jasie's small dog makes a star appearance.....

9-13-aptday (22).jpg
The fridge goes into it's place to await the kitchen next week.....

9-13-aptday (23).jpg
SKGR begins to unpack our small belongings.......

9-13-aptday (24).jpg
It's 5pm and I have a meeting. Tino and Peter take a final look at the fridge before heading out.

Thanks to all of you who helped us out on this day!