Emily & Aaron's Condo: Finishing Touches

Emily & Aaron's Condo: Finishing Touches

Renovation Diary
Nov 4, 2014
The kitchen - almost complete!
(Image credit: Emily and Aaron)
(Image credit: number)

Name: Aaron and Emily Choi
Type of Project: Full remodel, including the kitchen and two bathrooms
Location: La Jolla, California
Type of building: Condo; 1300 square feet

The Renovation Diaries are a collaboration with our community in which we feature your step by step renovation progress and provide monetary support towards getting it done in style. See all of our Reno Diaries here.

As our workers finish up final touches in the kitchen this week, we have started to move some furniture in. I know technically furniture is not part of a renovation but the right size furniture in the right nook can make the space so much more efficient.

Alex, our wonderful furniture designer, delivered and installed our desk.
(Image credit: Emily and Aaron)
Voila! It fits!
(Image credit: Emily and Aaron)

After much furniture shopping and not much luck, I was connected with an architect who turned furniture maker. It was great because we were able to speak the same language, or rather use the same 3d software, and I was able to show him exactly what I needed. He brought over two pieces this week (more to come!) and they were beautiful. They fit into the spaces perfectly and the price is more than reasonable.

(Image credit: Emily and Aaron)

After much of the drama last week, the flooring is done and the handrail is in! The fireplace frame is also complete. It turned out a bit bigger and higher than what I had wanted, but with the fire code there's not much choice.

It's so good to have a functioning kitchen.
(Image credit: Emily and Aaron)
The glass door inserts are in.
(Image credit: Emily and Aaron)

The crown molding and glass insert for the cabinets that I mentioned in previous posts are also done. Everything is a bit chaotic with the sawdust and plastic wraps everywhere but we are happy to be finally in the house!

A sneak peek at our beautiful new kitchen.
(Image credit: Emily and Aaron)

Estimated time for project: 8 weeks
Time remaining: 1 week

This is the last week of work for Emily and Aaron's renovation! If you haven't already, check out the other posts in the series to get caught up — and stay tuned for the Big Reveal.

(Images and diary text: Emily and Aaron Choi)

More posts in Renovation Diary: Emily & Aaron's Condo