The clock ticks.... Alright, it don't look like much, but this pic at right shows one of the last blocks of triple layered insulation being mounted between the beams on the ceiling. The rest is all done. After pulling down the old ceiling, revealing the beams, removing all nails, planing and finishing the beams, installing electrical wiring, and now mounting custom sizes of insulation board all the wall along the ceiling, a big part of this job is done. MGR

See Slideshow of Week 6

Next Week:

Super pimpy doo stairs installed. Grid & stairs welded together (much fun, many sparks) Loft floor installed on top of steel grid Floors w/water based low tox TREX